On Sun, Aug 16, 2020 at 4:50 PM Thomas Hartman via bitcoin-dev < bitcoin-dev@lists.linuxfoundation.org> wrote: > My understanding is that adding a single op_difficulty operation as > proposed would enable not true difficulty futures but binary options > on difficulty. > > https://en.wikipedia.org/wiki/Binary_option Any kind of opcode is a binary option. Either the output can be spent or it can't. You could get a pseudo-continuous future by having lots of outputs with different thresholds. Alice and Bob create a transaction with 100 outputs and each having 1% of the future's value. Output 0: Pay Alice if diff < 1.00 trillion else Bob Output 1: Pay Alice if diff < 1.01 trillion else Bob .... Output 98: Pay Alice if diff < 1.98 trillion else Bob Output 99: Pay Alice if diff < 1.99 trillion else Bob If the difficulty is 1.25 trillion, then Alice gets outputs 0-24 and Bob gets outputs 25-99. The future has a tick size of 1%. It isn't very efficient though It would be good to have the option to specify a block height for the future too. If it triggered on block time, then miners have an incentive to give false block times. I am not clear if there is a way to solve the accounting for the > payouts, but perhaps there is a way to do this with covenants. > I agree you would need covenants or something similar. There needs to be a way to check the outputs (value and script) of the spending transaction. You also need a way for Alice and Bob to create their spending transaction in sequence. Output 0: Pay Alice if [output value 0] <= Diff / 1 trillion AND [output value 1] >= (2 trillion - diff) / (1 trillion) AND [output 1 pays to Bob] To spend her output, Alice has to create a transaction which pays Bob and assigns the coins in the right ratio. [output value x] means the output value of the spending transaction for output x. To get it to work Alice creates a transaction with these restrictions Output 0: Script: Anything (Alice gets it to pay herself) Value: <= Diff / 1 trillion Output 1: Script: Must pay to Bob Value: >= (2 trillion - Diff) / 1 trillion You also need to handle overflows with the calculations. Bob can then spend output 1 and get his money. There is a hold-up risk if Alice doesn't spend her money. You can make the output script so either of them can spend their coins to avoid that. Output 0: Pay Alice if [output value 0] <= Diff / 1 trillion AND [output value 1] >= (2 trillion - diff) / (1 trillion) AND [output 1 pays to Bob] OR Pay Bob if [output value 0] <= (2 trillion - Diff) / 1 trillion AND [output value 1] >= Diff / (1 trillion) AND [output 1 pays to Alice] You would need a covenant-like instruction to check the output values and scripts and the diff opcode to get the difficulty.